2017 Resurfacing Project

This project included approximately 4.7 miles of streets

9th Street Paving

Non-Motorized Pathways – Approximately 0.9 miles were resurfaced of HMA pathway at Window on the Waterfront. $100,000 of concrete sidewalk repairs were made primarily in the central city.

A traffic light was installed at 16th Street & Columbia with widening of the intersection and turn lanes added.